The L Series at dusk
Modulator · for your funnel01 · Configure · live

Can they build it on their site?

First the unit, then the site. Configure it below, press Enquire, and the same spec runs the verdict, the quote, the deposit and the handover file. Nobody retypes it, so nobody mistypes it.

01 · Configure · livefor your funnel

The buyer picks size, cladding and options and watches the figure move. Here it runs on the flagship range; in your build it runs on yours, on your own domain. Press Enquire in the tool and the configured spec carries into the site test below.

The whole thread · for your funnelenquiry to handover, one record
  1. 01ConfigureThe buyer specs the unit in the browser, and that spec flows into every step below. live
  2. 02Site VerdictTheir Eircode, seven national datasets, the real Class 3A test. live
  3. 03Fixed QuoteA price that holds, with groundworks named in three evidenced bands rather than one optimistic number. demonstration
  4. 04ReserveThe quote becomes a commitment the same evening. Stripe test mode. demonstration
  5. 05Production packThe reserved spec becomes a work order: BOM from the unit geometry, drawings, a committed factory slot. demonstration
  6. 06Build recordEvery artefact accretes onto one append-only project record as the build runs. demonstration
  7. 07Handover fileThe record, indexed and handed over: certs, warranty, manuals, BER, and it transfers at resale. demonstration
02 · Site Verdict · live · national datasetsfor your funnel

Their Eircode. Seven national datasets. The real S.I. 340/2026, Class 3A test, in two minutes, on the spec configured above. The fixed quote follows on the same sheet.

  1. Site/
  2. Pin/
  3. Unit/
  4. Six questions/
  5. Verdict

Any Irish Eircode or address. Resolved live against the national datasets, confirmed on a map before anything runs.

Or run a sample site, instantlysample data
04 · Reserve · demonstrationfor your funnel

This is where an enquiry becomes a commitment, the same evening, while the buyer is still sure. Stripe’s own checkout, wearing our name today and your account at setup, so the deposit lands in your bank and the spec locks against it.

This step runs from the quote above: complete the verdict and the fixed quote, and the reservation opens against that locked spec.

05 · Production pack · demonstrationfor your funnel

The reserved spec becomes a work order without anyone retyping it: the bill of materials and cut list derive from the unit’s actual geometry, the drawings index attaches, and the factory slot carries a committed set date.

Change the unit above and watch every quantity in this table move. That is the sold spec driving the floor, with no one in the middle.

This step runs from the reserved spec: complete the quote above and the work order generates from it.

06 · Build record · demonstrationfor your funnel

A dispute in year eight is won with rows written in week two. Every notification, inspection, certificate and BER lands on one append-only record the day it happens, so nothing is ever hunted for afterwards.

This step runs from the record the earlier steps create: complete the verdict and quote above and the timeline begins itself.

07 · Handover file · demonstrationfor your funnel

When the home sells or refinances, this file transfers with it, and the next owner’s solicitor reads the record instead of ringing you. It assembles itself from what every step above already deposited, and it is handed over on day one rather than promised for later.

This step is the record above, indexed and handed over: complete the earlier steps and the file assembles itself.

One record, enquiry to handover.

Every step above deposits into the same project file: the spec, the verdict, the price, the deposit, the build evidence, the handover pack. That file is what your buyer keeps, and what your certifier, their lender and their solicitor stop chasing you for.

Ten specced enquiries, or the licence stops

If the journey has not produced ten qualified, specced enquiries by the end of your first full February to July season, you do not pay the licence until it has. You own the models, the configuration data and the domain from day one. Two build slots a month, because there are two of us.

What we need from you

One real site and one real unit you actually build. Send those two things and this journey runs with your name on it and your range in it.

The form is loading. Or skip it: darragh@silostudio.ie reaches both of us directly.

Any step here sells on its own. It costs more that way, and we say so rather than refuse. The full schedule lists every line, and the three scopes show how they are bought together.

Demonstration. Live steps read the national public datasets (Irish Public Sector Data, CC BY 4.0; geocoding via Esri and OpenStreetMap contributors) and this page is not a planning determination. No personal data is collected on this page.

Modulator · Silo Studio · CRO 789746Send a site and a unit